Home » News » Detail

Katy Flewellen Ground Breaking 2010


Posted On:- July 7, 2010

Katy Flewellen was a $3.6 million project that we designed for Fort Bend County. The project limits were from Pin Oak Road to Katy Gaston Road, a distance of just over 1 mile, and included the design of a 4-lane boulevard section with a bridge over the upper reaches of Buffalo Bayou. Included in the picture (left to right) Nathan Hatcher (FB), Keith Neshyba, (CP&Y), Commissioner Andy Meyers (Pct. 3), Judge Bob Hebert, members from Durwood Greene (contractor) and Erin Knesek (SPI).



katy465.jpg



Awards