CP&Y has a history of design achievements on highways throughout Texas. Our solid reputation is directly attributed to the dedication of our staff and the continued delivery of quality plans and specification in a cost-effective manner. |
| |
|
US 90A/SH 6, Houston District |
CP&Y provided a 2.5 mile PS&E reconstruction project of US 90A and 1.5 miles of SH 6 in Sugarland Texas. With a construction cost of $ 40,000,000, this project included all aspects of highway design including a complex grade separation of SH 6 over US 90A and two tracks of the UPRR. |
|
|
US 83, FM 1015 to Hidalgo/Cameron Co. Line, Pharr District |
The primary design tasks included aerial mapping, surveying, schematic design, public involvement, horizontal and vertical geometry, paving plans, hydrologic/hydraulic design, storm water drainage design, bridge and retaining wall layouts and design, signing, striping, signalization, illumination, traffic engineering and operations studies, traffic control, and SW3P. |
| |
 |
IH 30, Loop 12 to Tarrant County Line, Dallas District |
CP&Y provided the PS&E for the rehabilitation and widening of 6 miles of interstate freeway. This widening project included the design of the mainlanes and frontage roads, a comprehensive Traffic Control Plan, complex hydraulic analysis, major bridge design, and extensive Project managements and coordination through the Dallas and Fort Worth Districts, and the Area Engineers Offices |
| |
 |
IH 35/Loop 340 Interchange, TxDOT Waco |
The project included the designed horizontal alignments and vertical profiles for the mainlanes, frontage roads, direct connectors and ramps (including loop ramps) for this complicated project. CP&Y provided the design of detour alignments and profiles and developed grading plans for intersections and loop ramp locations. |
| |
 |
US 183, Patton Ave. to Boggy Creek, Austin District |
CP&Y provided the schematic and PS&E for three miles of this urban freeway reconstruction and widening project. With an estimated construction cost of $175 million, this project included the design of the mainlanes, frontage roads, direct connectors, collector distributor roads, managed lanes, and ramps. |
|