 Vista Ridge 

 Supply Program  

 

Part of the Vista Ridge, LLC, consultant team, CP&Y was contracted by the Central Texas Regional Water Supply Corporation (CTRWSC) to provide development phase and engineering services for the Vista Ridge Regional Supply Pipeline (VRRSP). The VRRSP consists of a well field, several miles of well collection line, over 140 miles of large diameter transmission main, multiple pump stations, water treatment facilities, and a customer delivery station.

This design-build project includes development of program design standards, specifications, route study, easement documents, pipeline design, coordination and incorporation of hydraulic and surge protection recommendations, testing and start-up procedures, operations and maintenance, quality assurance observations, maintenance of records, constructability and QC reviews, designers preliminary cost estimates for structural and mechanical, and permitting and construction phase services.

Services Provided:

  • Pipeline Design

​​

  • Pump Station Design

​​

  • Hydraulics

​​

  • Electrical/SCADA

 

  • Constructability Review

  • Testing and Start-up Procedures

 

  • Operations and Maintenance

 

  • Permitting

 

  • Construction Phase Service

Project Highlights

Client

Central Texas Regional Water Supply Corporation

Location

Central Texas

Size

 

140 Miles