Northeast Downtown Revitalization

CP&Y performed QLB utility designation and a topographic survey of a three-square block grid on the north side of the Round Rock Library for various water, wastewater, storm, and road improvements. All utilities were mapped including water, gas, telephone, electric, storm and sanitary sewer. CP&Y provided the client with an AutoCAD file of the utility designation.

Project Highlights

Client

City of Round Rock

Location

Round Rock, Texas

Size

 

3-Square Block Grid