top of page

Northeast Downtown Revitalization
Our team performed QLB utility designation and a topographic survey of a three-square block grid on the north side of the Round Rock Library for various water, wastewater, storm, and road improvements. All utilities were mapped including water, gas, telephone, electric, storm and sanitary sewer. We provided the client with an AutoCAD file of the utility designation.
​
Project Highlights
Client
​
City of Round Rock
Location
​
Round Rock, Texas
Size
3-Square Block Grid
bottom of page